Breaking

Thursday, June 7, 2018

Kalrez Petroleum (Seram) Ltd., Facilities Engineering Lead

Facilities Engineering Lead

Jan 2006 – Dec 2012

Jakarta - Bula (Maluku)

As a facilities engineering lead, I got involved in hundreds of projects and had responsibilities that include but not limited to:

(1) Managing engineering & construction projects of oil and gas facilities and infrastructure--including well's surface facilities, oil storages, gathering stations, block stations, oil-gas-water separators, building, jetty, flowline & pipeline, power generators -- as well as operating troubleshooting.

(2) Managing integration of design, construction, and maintenance to make sure facilities availability, maintainability, and reliability, to minimize unplanned shutdown.

(3) Preparing conceptual design, FEED, detailed design.

(4) Preparing project requirement and specification.

(5) Planning and controlling project time schedule, cost, risk, and quality.

(6) Applying national or international standard in design (ISO, SNI, ANSI, API, ASME, NACE, etc.).

(7) Applying Indonesia"s PSC system in budgeting and cost estimating (WP&B) and project proposal (AFE)

(8) Complying laws, rules and recognized best of practice.


No comments:

Post a Comment